This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
en:freigabeprozess [2019/08/15 09:06] – cbuehler | en:freigabeprozess [2023/04/25 10:59] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
- | ==== 7.1 Creating an Office Document | + | ===== 8.1 Fundamentals |
- | Office documents | + | In Teamcenter, processes (workflows) |
+ | |||
+ | A set status cannot be reset. After a revision has been released, a new revision must be created | ||
+ | |||
+ | __The following release levels are provided: __ | ||
+ | |||
+ | Engineering Release (ER): This release is used to define a revision in the PLM system. Optionally, a " | ||
- | To create a new Office document please go to File -> New -> Item... and select the element | + | When the release is set to "ER", there is no SAP transfer. A new revision can be created without a change notice (change notice or simply change). |
- | {{:uc_workingwithoffice_de_001.png? | + | Preseries (pre-series, |
- | {{ : | + | A distinction is made between " |
+ | |||
+ | ===== 8.2 Engineering Release (release after " | ||
- | The following form will appear | + | During release, certain conditions are checked without |
- | {{ : | + | * This is an object of type "FFG EngItemRevision" |
- | If you select "Open on creation" | + | * All mandatory attributes are filled in |
- | {{ : | + | * The naming was selected from the naming catalog (naming ID is set). |
- | Now simply drag and drop the desired document onto the Revision item. Confirm with OK to check the document | + | * For an assembly, all components of the first stage must have the same or a higher release status, or the components must be contained |
- | A double click on the document opens it automatically and unchecks it from Teamcenter. | + | * All revisions have no status (are in " |
- | {{ :uc_workingwithoffice_de_005.png?direct& | + | |
+ | To make a design release, proceed as follows. | ||
+ | |||
+ | Select one or more revisions to be released. These can be individual parts or assemblies. | ||
+ | |||
+ | Select File → New → Workflow Process... or press Ctrl+P or Ctrl+P on the keyboard. | ||
+ | |||
+ | {{ :uc_approvalprocess_en_001.png?direct |}} | ||
- | You can now make changes to the document. After saving | + | The workflow "FFG 01 Engineering Release" |
+ | |||
+ | No further entries need to be made. However, it is possible to include or remove further revisions as so-called " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In Teamcenter Navigator, an icon {{: | ||
+ | Press OK. If all conditions are fulfilled, the workflow starts and you can see the started workflow in your inbox {{: | ||
+ | |||
+ | First open the entry " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | You can now select the desired neutral formats. The default formats are JT and PDF. If the default settings are sufficient, you can skip this step, otherwise press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select the neutral formats and press "Save and Check-In" | ||
+ | Then press the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | A menu opens in which you can select whether a self review or a peer review is to be performed. | ||
+ | |||
+ | Press "Self Review" | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In the Teamcenter Navigator, a symbol xxxxxx indicates that an object is in a workflow. This means that the object is write-protected, | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | As soon as the workflow is completed, the release status (in this case " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | |||
+ | ==== 8.2.1 Release with Reviewer ==== | ||
+ | |||
+ | When releasing according to ER, you also have the option of specifying a " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In the following dialog you can now select a " | ||
+ | |||
+ | Press the " | ||
+ | |||
+ | Select a person from the right field of the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The person is added to the Signoff team and is selected as the releasing person. You can now press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The releasing person now receives the task in his/her " | ||
+ | |||
+ | As the person who has released the task, select the task and press the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In the following dialog press " | ||
+ | |||
+ | Press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The decision is displayed in green, you can close the dialog with " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The release process now continues in the background, as a result the neutral formats are generated and released together with the revision(s) of the workflow to the status ER. | ||
+ | |||
+ | |||
+ | ===== 8.3 Engineering Release (release after " | ||
+ | |||
+ | The approval process of a part with an AutoCAD drawing is essentially identical to the approval process of all other parts. The only difference is that a Tiff is always generated from the AutoCAD drawing. | ||
+ | |||
+ | To release such a part select one or more revisions and select "File → New → Workflow Process..." | ||
+ | |||
+ | In the following dialog select the workflow "FFG 01 Engineering Release", | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select the new task in your inbox and press the " | ||
+ | |||
+ | In the following dialog select "Self Review" | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | After a while the revision | ||
+ | |||
+ | |||
+ | ===== 8.4 Serial release (release after " | ||
+ | |||
+ | When you release a series, that is, release it to status SE, the data is transferred to SAP. The material master, structure (if available) and documents (info records and files) are transferred. | ||
+ | |||
+ | The series release can be started by any designer. This means that a person from the same group (for example, " | ||
+ | |||
+ | After the serial release, a part can no longer be changed except by administrative intervention. | ||
+ | |||
+ | During release, certain conditions are checked, without which the workflow does not start. Condition for a series release are: | ||
+ | |||
+ | * It's an object of the FFG EngItemRevision type. | ||
+ | * All mandatory attributes are filled in | ||
+ | * The naming was selected from the naming catalog (naming ID is set). | ||
+ | * For an assembly, all components of the first stage must have the same or a higher release status, or the components must be contained in the same release workflow. | ||
+ | * All revisions to be released do not already have the status " | ||
+ | |||
+ | To make a series release, proceed as follows: | ||
+ | |||
+ | Select one or more revisions to be released. These can be individual parts or assemblies. | ||
+ | |||
+ | <WRAP tip>< | ||
+ | |||
+ | Select "File -> New -> Workflow Process..." | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The dialog for creating a new workflow opens. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select the FFG 03 Series workflow and press OK. No further input is required. However, it is possible to include or remove further revisions as so-called " | ||
+ | |||
+ | <WRAP info>< | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In this case, you can make any necessary changes and restart the workflow. | ||
+ | |||
+ | If all conditions are met, the workflow starts and you can see the started workflow in your inbox in the Teamcenter Navigator under "Tasks to Perform" | ||
+ | |||
+ | First open the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | You can now select the desired neutral formats. The default formats are JT and PDF. If the default settings are sufficient, you can skip this step, otherwise press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select the neutral formats and press "Save and Check-In" | ||
+ | |||
+ | Then press the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | A menu opens in which you can select a reviewer/ | ||
+ | |||
+ | Select a person in the right menu window under " | ||
+ | |||
+ | Press " | ||
+ | |||
+ | The following tasks are performed by the person selected to release the revisions. This person receives a release request by e-mail. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select the task in the worklist under "Tasks to Perform" | ||
+ | |||
+ | Press the button " | ||
+ | |||
+ | In the following dialog press "No Decision" | ||
+ | |||
+ | In the following dialog, section " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The workflow now continues. After a short while, the " | ||
+ | |||
+ | Under "My Worklist -> Tasks To Track" you can follow the workflow. In this example the neutral formats are created. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | After the workflow has been completed, the creator of the workflow receives a notification by e-mail and the parts have the status " | ||
+ | |||
+ | The status is displayed in the column "Item Rev Status" | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In the Teamcenter Navigator, the status is displayed as an icon on all released objects. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | |||
+ | ===== 8.5 Changes and release after changes | ||
+ | |||
+ | If a part that already has series release is to be released again after a change, a change notice is required. In general, this is also referred to as a change. | ||
+ | |||
+ | However, a part can be revised without a change and can also be released with the status ER. | ||
+ | |||
+ | To make a change to a released part, first create a new revision. To do this, select an existing revision and then choose "File -> Revise..." | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The revision dialog opens. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The model (UGMASTER) and the drawing (UGPART) | ||
+ | |||
+ | In order to release the new revision to the status " | ||
+ | |||
+ | Select "File -> New -> Change..." | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The change number is automatically assigned by Teamcenter. The attributes " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Enter any values for " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | If you selected a folder, the Change object is inserted here. Otherwise the Change can be found in the Newstuff folder. | ||
+ | |||
+ | |||
+ | ==== 8.5.1 Adding participants ==== | ||
+ | |||
+ | In order to be able to work on a change, you must be assigned to it as a participant. The person who created the change can assign participants with different roles to it. For the sake of simplicity, we at FFG will only use the role " | ||
+ | |||
+ | Select the revision (!) of the Change object and choose "Tools -> Assign Participants..." | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | The dialog for assigning persons known from the release process opens. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select a person with the role " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Then press " | ||
+ | |||
+ | ==== 8.5.2 Solution Items and Problem Items ==== | ||
+ | |||
+ | A change is used to track changes under a common change number. Due to changes, so-called " | ||
+ | |||
+ | To add " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Then you can release the " | ||
+ | |||
+ | ==== 8.5.3 Start of the release process ==== | ||
+ | |||
+ | To release, select one or more revisions of the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Now select the workflow "FFG 03 Series with Change" | ||
+ | |||
+ | The rest of the procedure is the same as for series release. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Select a person who is to perform a review according to the principle of dual control. The possible persons are predefined, i.e. they must have the role " | ||
+ | |||
+ | This concludes your task as a designer with the role " | ||
+ | |||
+ | |||
+ | ==== 8.5.4 Review and Release ==== | ||
+ | |||
+ | When you receive a share request, select the appropriate task in your worklist and press the " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | Press the "No Decision" | ||
+ | |||
+ | The workflow will now be processed further. | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | When the workflow has run through, the revision and all objects referenced under it are released and the neutral formats have been created. Note that this revision has now received a " | ||
+ | |||
+ | |||
+ | ===== 8.6 SAP transfer (" | ||
+ | |||
+ | ==== 8.6.1 Introduction ==== | ||
+ | |||
+ | Even during the development process, bills of material can be transferred to SAP without actually being released. In this case, parts and bills of material are not write-protected and can be processed further. | ||
+ | |||
+ | The following rules apply when transferring to SAP: | ||
+ | |||
+ | * The BOM, that is, the revision that represents the assembly, must not have the status " | ||
+ | * Components or sub-assemblies that have not already been transferred to SAP (i.e. are "in working" | ||
+ | * After the transfer, the revision receives the status " | ||
+ | * If a revision already had the status " | ||
+ | |||
+ | |||
+ | ==== 8.6.2 Starting the SAP update ==== | ||
+ | |||
+ | Select one (or more) revision(s) to be transferred to SAP. You can do this in the Teamcenter Navigator or in the Structure Manager. | ||
+ | |||
+ | Press " | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | In the following dialog select the workflow "FFG 10 SAP BOM Update" | ||
+ | |||
+ | After the workflow has run through, you will see the status " | ||
+ | {{ : | ||