This is an old revision of the document!
In Teamcenter parts are called “items” or “item revisions”. The item is a kind of “bracket” that summarizes the revisions. An item always has at least one revision. The item number (item ID) is assigned when the item is created and then inherited by all revisions, i.e. the item ID of all revisions is always the same. Normally, an item ID cannot be changed in the normal way.
The item also contains properties (attributes) that must be the same for all revisions, such as the unit of measurement. This must never change at any part again - especially if SAP is used - and must also not be different for the revisions.
The name of the revisions can change, normally the item gets the name of the first revision. For FFG it was introduced via the naming catalog that the item name is identical to that of the last revision. However, the item name has no technical meaning.
In Teamcenter, you can create a part as follows:
Select “File → New → Item”.
In the following menu select “FFG Engineering Item”. Please use only this part type.
Press “Next”.
In the following dialog the properties of the item are assigned. Press “Assign” next to the “ID” field to assign a part number.
Notes:
Enter a name of your choice. This will later be overwritten by the naming catalog.
Enter a Unit of Measure.
Important note:
Press “Next”.
In this dialog, you can set the mandatory attributes required for a release.
If you click in the field “Naming Catalog ID” and make an entry, all entries will be displayed from the catalog which contain this text in the German or English name. You can select a suitable name or ID here, the German and English names are then entered into the Revision and Item attributes when saving.
The “Summary” tab of the revision now shows the English and German names.
To edit the revision information, select the revision in the Navigator.
The properties are displayed in the “Summary” tab. Make sure that they are also in the Summary tab and not in another tab.
Click on “Check-Out”. The revision is checked out and the tab is set to edit mode.
You can now edit the properties. Then you can save the changes with “Check-In” or discard them with “Cancel Checkout”.
In a PLM system, parts are revised in order to track changes. For FFG there are the following basic rules for revision:
To create a new revision, select a previous revision and then choose “File → Revise…”.
Further entries are not required. Press “Finish” to complete the operation.
A second revision “01” is then displayed under the item. All specifying documents such as 3D model (UGMASTER) or drawing (UGPART) are copied to the new revision.
Note that the neutral formats (Tiff, PDF, etc.) are not copied. These will be created when the revision is released.
Solid Edge
1. Solid Edge 2023 Update
Teamcenter Documentation
1. Overview
2. Teamcenter Basics
3. Working in Teamcenter
4. Working with CAD applications
5. Working with the structure manager
6. Workflows in Teamcenter
EPLAN - integrate2
1. Preamble
2. Function Description
3. Operating the Integration
4. Troubleshooting