This is an old revision of the document!
The module dialogs can be individually adapted.
Adapt table data
In each module dialog that contains table data, you can change the table layout as follows:
Position and columns are stored on the PC for the Windows user.
Adjust window sizes
Adjust the window size for each module dialog. The size will be saved for the user and restored in the next session.
Move event log window
Drag the event log window in each module dialog to a new position and resize it. Position and size are saved for the user and restored in the next session.
Move specific module windows
Analogous to the event log window in all module dialogs, the Overview and Details windows can also be moved and resized in the Synchronize Parts module.
This chapter describes use cases for creating new projects from different sources.
Note: Make sure you are in the EPLAN view that displays the Integrate menu. |
Create project templates and save them to the file system. With the integration you can then create new projects based on these templates.
Procedure
1. | Select Integrate > New Project. The module dialog opens. |
2. | In the Project Settings area, enter a name for the new project. |
3. | Optional: Specify a destination directory other than the default one. |
4. | Activate the Template tab in the Project Source area. |
5. | Select a schematic template from the list. |
6. | Click OK. |
Result
Integration allows you to create new projects based on existing projects in the project directory.
Procedure
1. | Select Integrate > New Project. The module dialog opens. |
2. | In the Project Settings area, enter a name for the new project. |
3. | Optional: Specify a destination directory other than the default one. |
4. | Activate the Design tab in the Project Source area. |
5. | Click More. |
6. | Select an existing project in the file system. |
7. | Click OK. |
Result
Save projects centrally with the integration and make them available to everyone in Teamcenter. With the integration you can then create new projects based on these projects.
Procedure
1. | Select Integrate > New Project. The module dialog opens. |
2. | In the Project Settings area, enter a name for the new project. |
3. | Optional: Specify a destination directory other than the default one. |
4. | Select the PLM tab in the Project Source area. |
5. | Click More. |
6. | Search for an existing project object in Teamcenter. |
7. | Click OK. |
Result
This chapter describes use cases for creating and updating EPLAN engineering information in Teamcenter.
The modular structure of this module dialog, combined with the ability to create and upload output files, allows you to store exactly the data in Teamcenter that is currently relevant.
Whether you just want to save the project or save the parts list, all these actions are started from the same module dialog.
Note: Select the correct project and make sure you are in the EPLAN view that displays the Integrate menu. |
With the integration you can manage the project files in Teamcenter and create and upload a PDF file for the schematic.
Before you start
A project not yet saved in Teamcenter is available locally. Such a project contains only the name in the title block of the drawing but no other Teamcenter information.
Procedure
1. | Select Integrate > Save to PLM. |
The module dialog opens. Unless otherwise configured, the Name field in the Innovation area is automatically filled with the project name. The value of this field is used as a description in Teamcenter. Adjust it if necessary. | |
2. | In the Innovation area, click Create. |
New objects are created in Teamcenter and the option Keep reserved is activated. | |
3. | Activate options for output files. |
4. | Click OK or Apply. |
Result
Next steps
Normally, when saving, you first create a new object in Teamcenter and automatically link it to the project. With the integration you can also manually link the project with an existing object in Teamcenter.
Before you start
A project not yet saved in Teamcenter exists locally and unlinked objects exist in Teamcenter.
Procedure
1. | Select Integrate > Save to PLM. |
The module dialog opens. Unless otherwise configured, the Name field in the Innovation area is automatically filled with the project name. The value of this field is used as a description in Teamcenter. Adjust it if necessary. | |
2. | In the Innovation section, click Assign. |
3. | Search for an existing and unreserved object in Teamcenter. |
4. | Optional: Activate options for output files. |
5. | Click OK. |
Result
You can use integration to retain or delete the object reservation when you execute the storage process.
When saving to Teamcenter, a newly created or manually linked object is automatically reserved for the current user. The Keep reserved option remains activated by default.
Check in (delete object reservation) | |
If you want to check in the project and thus delete the object reservation, deactivate the Keep reserved option the next time you save. |
Check out (reserve object) | |
If you want to check out an existing project and thus reserve the object for the current user, use the Open from PLM integration function. |
With the integration you can export the parts list from the parts list header and save it in Teamcenter. However, missing parts list items from the project can only be created in Teamcenter using the Synchronize Parts module.
Procedure
1. | Select Integrate > Save to PLM. |
The module dialog opens. Unless otherwise configured, the Name field in the Bills of materials area is automatically filled with the name of the BOM header from the project. The value of this field is used as a description in Teamcenter. Adjust it if necessary. | |
2. | Select an entry in the Bills of materials area and click Create. |
A new object is created in Teamcenter. | |
3. | Activate theBOM option. |
4. | Click OK. |
The parts list is exported from the project and compared with Teamcenter. The BOM Comparison dialog opens. | |
5. | Compare the BOM changes in the BOM Comparison dialog before uploading the BOM to Teamcenter. |
6. | Click OK. |
7. | Optional: If you discover errors in the parts list, click Cancel. In this case, no BOM information and output files are uploaded to Teamcenter. |
Note: Check the entries in the Missing parts tab. These BOM items do not yet exist in Teamcenter and therefore cannot be included in the BOM. |
Result
Next steps
This chapter describes how projects can be downloaded from Teamcenter and opened in EPLAN.
Note: Make sure you are in the EPLAN view that displays the Integrate menu. |
Solid Edge
1. Solid Edge 2023 Update
Teamcenter Documentation
1. Overview
2. Teamcenter Basics
3. Working in Teamcenter
4. Working with CAD applications
5. Working with the structure manager
6. Workflows in Teamcenter
EPLAN - integrate2
1. Preamble
2. Function Description
3. Operating the Integration
4. Troubleshooting